ADVERTISEMENT

ADVERTISEMENT

TRAFFIC AND CONSTRUCTION

The daily closures will last approximately one week.
The stops around Detroit Lakes included drug arrests, driving while intoxicated citations and speeding tickets.
You must have an opinion. This is your chance to share it either through an online survey or a meet and greet scheduled for Aug. 25.
No parking is allowed along Highway 59 prior to noon on Monday, August 1. Vehicles staged along Highway 59 after noon on Monday must be parked on the shoulder and parking is at the owner’s risk. Guests must stay within their vehicles and are not permitted to set up camps, chairs, grills, etc., outside of their vehicles.

ADVERTISEMENT

Latest Headlines
The bridge won’t be refurbished. Instead, it will be a full replacement beginning in 2028, with construction lasting five or six years.
Highway 71 remains detoured to through traffic between Clarissa and Browerville until early August, the Minnesota Department of Transportation reported.
This road work is expected through about July 22.
The Geographic Information Systems Department of Otter Tail County has just released a web map for the county's roads. It has similar features to MnDOT’s 511mn app.
After seven years of planning, two years of fundraising, and one year of construction, Grace Connection showed off its brand new church building in a dedication service and open house on Friday and Saturday, June 3 and 4.
After nearly two years, construction work on Arvig's downtown Perham location is nearly complete — take a look inside to see some of the changes.

ADVERTISEMENT

The time between Memorial Day and Labor Day is a high-travel period, marking the 100 most dangerous days each year to be on or near the road.
The project to improve this area of Wadena's entry has been under talks for over four years.
A worker witnessed the woman drive through a barricade into the concrete on Seventh Street Northeast in Rochester.

ADVERTISEMENT

ADVERTISEMENT