The Wadena City Council approved DGR Engineering to draw up a preliminary engineering design for electric distribution system improvements in Wadena.
As part of citywide plans to convert all of the lower voltage transmission system to the more efficient 7200 volts, Tim Johnston, Wadena electric and water superintendent, asked for approval of preliminary engineering design for development of a new feeder circuit originating from the Southeast Substation.